How Is Custom Software Cost Calculated? A Realistic Expectations Guide
Table of Contents — English
What's Behind the Price Difference?
There can be a 200-300% difference between quotes you receive from two companies for the same project. This difference usually comes from: scope interpretation differences, team seniority differences, and hidden variable items (integration, testing, documentation missing from some quotes). The lowest bid usually means the narrowest scope. As the project progresses, additional charges may come in as 'this was out of scope' and total cost can eventually exceed even the highest bid.
7 Components That Determine Custom Software Cost
- Analysis and design time: Discover + Design phases constitute 25-35% of total project duration. Cheap quotes that skip these phases produce scope problems later.
- Development capacity and seniority mix: A full-stack senior developer costs 2-3x more than a junior but does the same work 3x faster with fewer errors.
- Testing and quality assurance: Teams that write automated tests dramatically reduce future maintenance costs.
- Integration development: Each API integration (accounting, payment, shipping, ERP) is a separate work item. Clarify upfront.
- UI/UX design: User experience design is absent or minimal in some quotes; good UX also shortens development time.
- Infrastructure and devops: Server setup, CI/CD pipeline, monitoring tools — some companies leave this out as 'client handles it.'
- Maintenance and warranty period: Is there a standard 90-day post-delivery warranty? What is SLA-based maintenance cost?
Price Ranges: Turkey Market Reality
Typical ranges observed by PROJX Digital in the 2024-2025 Turkish market: Simple MVP (5-8 features, single platform): 150,000-350,000 TRY, 8-14 weeks. Mid-scale enterprise application (ERP/CRM module, with integrations): 400,000-1,200,000 TRY, 4-8 months. Complex platform (multi-module, API network, high-traffic architecture): 1,200,000 TRY+, 6-12+ months.
5-Year TCO Calculation: This Is the Real Decision
Evaluating software decisions with one-time development cost is misleading. The real decision question is: what do I pay in total over 5 years? In the off-the-shelf scenario, annual license fees typically increase above inflation. In the custom development scenario, the starting cost is high but only maintenance and new feature development costs exist in subsequent years. No license increases, no plugin commissions.
FREQUENTLY ASKED QUESTIONS
Key Takeaways
- Behind the price difference lie scope interpretation, team seniority, and hidden variables — compare quotes line by line.
- A 5-year TCO calculation makes custom development more economical than off-the-shelf in most cases.
- The most reliable cost estimate is made after the Discover phase, after the scope document is prepared.
- The MVP approach is the smartest starting point for transitioning to custom software on a constrained budget.